This article describes the operation of the specific automation ''When the status of a card in stage something changes to something, add label something''.
Are you looking for an explanation of what Automations are and where to set it up? Then take a look at the article How do automations work?
How does this automation work?
With this automation, you can ensure that a label is automatically added when someone changes the status of a card in vPlan.
The parameters you set are status, stage and label
Status: Choose at which status you want a label to be added (e.g. status Done).
Stage: Choose in which phase of your plan board the status change should take place (or multiple or all phases).
Label: Choose which label you want to be automatically assigned after the status change.
Example:
You want a quality check to take place after reporting the last step in your order. You want to indicate this with a label in your planning board.
You can then set up your automation as follows: